WEDNESDAY, SEPTEMBER 16, 2026BECOME A PARTNER
The Detroit Bible

◆  The Good Word on Metro Detroit  ◆

Good News

DDOT Coolidge Terminal: $160 million bus facility opens on the west side

DETROIT. DDOT opened its new Coolidge Terminal, a $160 million, 200,000-square-foot bus facility on Detroit's west side. Federal money covered $102.5 million of the cost, the city put in $31.5 million, and the state added $25.6 million.

The complex holds a climate-controlled garage for 120 buses, a maintenance building, and an administration building with a lounge, kitchen, gym, lockers and showers for drivers and mechanics. It replaces the aging Gilbert Terminal and the original Coolidge facility, which ran from 1928 until a fire destroyed it in 2011. The east side's Shoemaker Terminal keeps operating as before, and the new building was designed with room to expand.

Read the full story at Daily Detroit

This is a reader-friendly summary. The full story belongs to Daily Detroit — go give them the click.

← Back to the feed
DDOT Coolidge Terminal: $160 million bus facility opens on the west side — The Detroit Bible